Full home interiors

End-to-end design for a whole residence, from planning through to the day the furniture arrives.

This is the full appointment: we start at the plan and stay until the last snag is closed. It suits a bare developer handover, an older flat being stripped back, or an occupied house that has to keep working around us — we have done all three, and the third is the one that needs the most careful phasing. If your home falls into that last category, say so early; it changes the programme more than the square footage does.

You deal with two people throughout: Ananya through design, Sneha through site, and both of them at the overlap. Decisions come to you in batches rather than as a stream of questions — typically four or five sign-off points across the whole project, each with everything you need to decide in one sitting. Between those points we get on with it and you do not have to think about your house.

What is included

  • Site survey and measured drawings
  • Space planning and furniture layouts
  • Concept presentation with material direction
  • Full material, finish and fixture specification
  • Bespoke joinery design and shop drawings
  • Lighting layout and electrical setting-out
  • Procurement schedule and supplier coordination
  • Site supervision through execution
  • Styling and handover

What is not included

  • Structural engineering and statutory approvals
  • HVAC design and civil works
  • Society permissions and municipal liaison

How this runs, stage by stage.

  1. 01

    Consultation

    1–2 WEEKS

    We visit the space, measure it, and establish the budget before any drawing begins.

  2. 02

    Concept

    2–3 WEEKS

    Plans, a spatial idea and a material direction — presented once, revised once.

  3. 03

    Design development

    3–5 WEEKS

    The drawing set: joinery, lighting, electrical, finishes and every fixture specified.

  4. 04

    Execution

    8–16 WEEKS

    Work on site, supervised weekly, with a written report against the programme.

  5. 05

    Handover

    1–2 WEEKS

    Snagging, styling, warranties and a maintenance note for every finish.

The full process, in detail